SAA - Salma Abderahim ArchitecteSalma Abderahim Architecte Français عربية Start my project
Transparency

Fees: what an architect costs, and why

Most of the disappointments on a building site come from a vaguely defined commission. This page sets out the ranges applied, what they cover and what they do not. Every project then receives a written proposal, phase by phase.

Percentage based

Full commission

From the first sketch to handover: design, building permit, contractor tendering, site supervision. The fees follow the pre-tax value of the works:

Type of projectRange
Detached villa8 to 12%
Residential building6 to 10%
Retail unit / offices8 to 12%
Hospitality / tourism10 to 15%
Major renovation / riad12 to 18%
Interior architecture10 to 20%

These ranges are consistent with the profession's indicative scale and with the practices observed in Casablanca and Rabat; the exact rate depends on the complexity and on the level of supervision required.

Fixed fee or time spent

Defined assignments

On-site assessment + written opinion1,500 to 2,500 MAD
Design + permit, villa of 150-200 sqm15,000 to 40,000 MAD
Interior design, apartment8,000 to 25,000 MAD
Hourly advice300 to 800 MAD

The assessment is deducted from the fees if you then entrust me with a commission. It is the recommended way in: one visit, a reading of the regulations, a written budget estimate, and you decide with all the facts in hand.

Request an assessment

Start by estimating your construction budget with the build cost calculator.

Included

What the fees cover

  • Architectural drawings and graphic documents for each phase
  • Building permit file and Rokhas submission
  • Tender documents and comparative analysis of quotations
  • Site supervision with written progress reports
  • Assistance at handover and clearing of snagging items
Additional

What is added to the budget

  • Structural and building services engineering
  • Thermal (RTCM) and geotechnical studies
  • Municipal taxes and filing charges
  • Technical inspection body and laboratory where applicable

I coordinate these consultants and include them in the overall budget presented from the outline design stage onwards: no costs discovered along the way.

FAQ

How to read a fee proposal

Percentage, fixed fee or time spent: how do I choose?

Full commission with construction works: percentage. Short, clearly defined assignment (permit, interior design): fixed fee. One-off advice: time spent. The right choice depends on the scope, not on the amount.

Is a cheaper quotation really cheaper?

Compare the phases included, not the rate: a "cheap permit" with no site supervision is paid for later in variations, defects and delays. Insist on a written breakdown: sketch, outline design, detailed design, permit, tender documents, supervision.

Does signing off a file on its own exist?

It is prohibited by the Order of Architects: an architect must design and take responsibility for the drawings he or she signs. I refuse this practice, which exposes the client to cancellation of the permit and to serious risks in the event of damage.

Why is the initial assessment charged for?

Because it involves real work and real responsibility: site visit, regulatory analysis, written estimate. It is deducted if you entrust me with the commission.

Next step

Receive a properly framed estimate

Describe your project: type, city, budget in mind. You receive a first reading and, if you wish, an on-site assessment.

Start my project

Reply within 24 working hours

WhatsApp